UPDATE
BIGTIME
All is well here at the ranch and the new engine for DaHoooooley is all done and ready to drop back in the truck. (ABOUT DAMNED TIME EH)
Finished getting all the last little tid bits on it. Started with the injectors, injector lines and then all the elctrical wiring for the IP and sensors.
Once that stuff was on came the water X over, fuel return bridle and hoses and the return lines on the injectors.
Then came the heat shield for the RH side injectors.
Dropped the intake on and got all the stud top bolt locations sorted out and installed.
Air top hat is all on and the Turbo oil line and the cooler lines.
Serp drive brackets and the vacuum pump buttoned down too.
I can't go any farther now, the sucker is finally ready to drop back in the truck.
Washed out the oil cooler and got it all ready to bolt back on.
The new block has 1/2 inch pipe threaded oil ports to the cooler, but the old one was 3/8 pipe thread.
I had new cooler lines already and the snap in fittings so I just bought some 1/2 to 3/8 adapters. These do not have a flange on them, you simply thread them onto the original adapter and then into the block.
These adapters will allow the original fittings to be fairly close to the original location.
I loctited the adapters to the fittings and used silicone between the adapter sleave and the block.
Hoepfully if I ever need to take them out (hope never) but the idea is that the entire thing will come out of the block.
Snapped the lines back into the fittings and fastened the bracket to the front motor mount.
DONE DEAL folks.
The lines are all tied up so I can drop the engine in and then route the lines back under the grill area.
The plan is to drop the engine back in next weekend.
WE SHALL SEE
Missy